Mott Electric and AxisTech once again collaborate to connect a special fibre tailing cable for two state-of-the-art “Electric Megamax STS” Cranes at Deltaport Terminal, Port of Vancouver. [twocol_one] Working in a very tight timeframe with only...
The AxisTech Senior Project Manager, David Mayhew recently attended two training courses (CFI and Installer2) at The Fibre Optics Association, Inc. to upgrade and heighten the team’s collective intelligence in Fiber Optic Installations and Large-scale...
AxisTech Emergency Response Team Rose to the Challenge and Flew to the Hydroelectric Plant near Sechelt, BC for Critical Fibre-Optic Repairs Damaged by Fire. During the September 2015 Labour Day long weekend, AxisTech Services fibre specialist team was contacted by...
The BC Ministry of Transport awarded contractor Trans-Western Electrical Ltd to extend the communications infrastructure of HWY91-HWY91a. TWE aligned with long-time partner, AxisTech, for the installation, termination and testing of the designed fibre optic cable...
The BC Ministry of Transport awarded contractor Trans-Western Electrical Ltd to extend the communications infrastructure of HWY91-HWY91a. TWE aligned with long-time partner, AxisTech, for the installation, termination and testing of the designed fibre optic cable...