At AXIS Technical Services, we are proud of our ability to assess, plan and implement large-scale, high-performance communication infrastructure projects on budget and within the workback schedule timeline. We initiate and maintain a five-step assessment process for all projects regardless of size and scope. Our project success stories were created to showcase the assessment process in a real project delivery, how we overcome specific challenges and to highlight our client’s demand for measurable results. We encourage you to review our technical and implementation capabilities and our problem-solving skills. Contact us today and learn about the AXISTECH difference.
Case Studies
Langara Science & Technology Building Showcase the Glenco & AxisTech Teams
Categories: Case Studies, News

Responding to a construction project RFP from BC Bid; Axis Technical and Glenco Electric were awarded the Langara College flagship building contract for the Science & Technology facility. A long-time customer of Axis Technical Services, Langara welcomed the latest collaboration with these experienced teams and their understanding of the expected levels of quality, expertise and […]
The Axis Group Secures a North American Data Centre Expansion
Categories: Case Studies, News

Following their success of a North American firm’s Phase One, Axis Systems Group was awarded the contract to complete Phase Two of the security upgrading for one of the existing data centres in Vancouver, B.C. Canada. Phase Two design and build-upgrade was realized over three months of summer 2016. Call 604 559 AXIS (2947) or Email ROI[at]AxisTech.ca to Schedule a […]
Chilliwack School District – Security Enhancements
Categories: Case Studies, News

After successfully installing the first Passive Optical LAN (POL) System in Western Canada at the Chilliwack School District of British Columbia; Axis Systems Group was the logical fit to fulfill the district’s latest surveillance requirements. Call 604 559 AXIS (2947) or Email ROI[at]AxisTech.ca to Schedule a Needs Assessment with our Ownership Team.
The Coast Mountain Bus Company Hamilton Transit Centre
Categories: Case Studies, News

ATS – Axis Technical Services has teamed up with electrical contractors, Protec Installations Group, to secure the winning bid for The Coast Mountain Bus Company Hamilton Transit Centre. The teams were selected for their exceptional combination of SPQ: Service, Price and Quality. AxisTech was an integral part of the Protec Installations delivery team. ATS commends […]
The FortisBC Tilbury LNG Facility Expansion Building
Categories: Case Studies, News

Bantrel, a global specialist in Oil, Gas & Chemicals, Mining & Metals, Power Industry contacted Axis Technical Services to enquire about a collaboration on FortisBC’s Tilbury LNG Expansion Building. AxisTech commenced with the Bantrel pre-qualification process which included a in-depth tendering analysis that extended over a six months. Responding to their RFP; AxisTech was awarded the […]
Delbrook Community Recreation Centre Security and Surveillance Project
Categories: Case Studies, News

Responding to the electrical scope-of-work, the Axis Systems Group was selected to build and install the new security and surveillance system. The security system included Samsung SNV-6084R, a HD vandal-resistant IR dome camera, which featured the most advanced functions from Samsung with 2 megapixel 1080p high definition images, and the Hewlett Packard Enterprise network switches […]
Making Connections… Deltaport, Mott Electric & AxisTech
Categories: Case Studies, News

Mott Electric and AxisTech once again collaborate to connect a special fibre tailing cable for two state-of-the-art “Electric Megamax STS” Cranes at Deltaport Terminal, Port of Vancouver. According to the Deltaport Terminal website: Deltaport is the Port of Vancouver’s largest container terminal, located at Roberts Bank in Delta. It handles containerized cargo and some […]
Pacific Blue Cross Building – Magil Construction & AxisTech a Key Collaboration
Categories: Case Studies, News

Magil Construction Group, Mott Electric and Axis Technical Services were key collaborators on the Pacific Blue Cross Building located on Canada Way in Burnaby, BC. About Pacific Blue Cross: Pacific Blue Cross has been British Columbia’s leading benefits provider for over 75 years. Our comprehensive understanding of health care fuels our commitment to service. Together […]
Meridian Farm Market – Fully-Integrated Security and Communications System
Categories: Case Studies, News

With the Grand Opening of the Meridian Farm Market new flagship store in Maple Ridge, BC, the 25+ year family business required a fully integrated security and paging system. Call 604 559 AXIS (2947) or Email ROI[at]AxisTech.ca to Schedule a Needs Assessment with our Ownership Team.
Maple Ridge City Hall – Re-Terminating Backbone Infrastructure
Categories: Case Studies, News

Answering the call for immediate data re-connection, Axis Technical Services (ATS) addressed Maple Ridge, BC City Hall’s need to resolve their legacy IT communications network. Call 604 559 AXIS (2947) or Email ROI[at]AxisTech.ca to Schedule a Needs Assessment with our Ownership Team.