At AXIS Technical Services, we are proud of our ability to assess, plan and implement large-scale, high-performance communication infrastructure projects on budget and within the workback schedule timeline. We initiate and maintain a five-step assessment process for all projects regardless of size and scope. Our project success stories were created to showcase the assessment process in a real project delivery, how we overcome specific challenges and to highlight our client’s demand for measurable results. We encourage you to review our technical and implementation capabilities and our problem-solving skills. Contact us today and learn about the AXISTECH difference.
Case Studies
Hartley Bay – BC First Nations Community Benefits from the AxisTech Fibre-Optics Communications Infrastructure.
Categories: Case Studies, News

During the Summer of 2013, the First Nations Community in Hartley Bay, located on the coast of British Columbia, contacted AxisTech to design, build upon and stabilize the Band’s fibre optic internet service. The goal of the 200+ Band members was to work interdependently with AxisTech to become self sufficient with the proposed new technology-forward […]
City of North Vancouver – Fibre Optic Network & Traffic Control Management System
Categories: Case Studies, News

To Better Manage Connectivity, Communications, and Safety The City of North Vancouver’s vision is to become a highly engaging community that celebrates its vibrant and diverse neighbourhoods. With this mandate, the City needed to upgrade its legacy communications infrastructure to a technology-advanced fibre-optic network with maximum bandwidth and heightened security. The City’s first priority […]
Large-Scale Communications Infrastructure: HWY91 ~ HWY91a Alex Fraser Bridge & Beyond
Categories: Case Studies, News

The BC Ministry of Transport awarded contractor Trans-Western Electrical Ltd to extend the communications infrastructure of HWY91-HWY91a. TWE aligned with long-time partner, AxisTech, for the installation, termination and testing of the designed fibre optic cable system. To execute the complex project, the results-driven teams provided the large-scale communications infrastructure project with planning, expertise, knowledge, safety, […]
Large Scale Industrial, Outside Plant Fibre Optic and Security Solutions for Forrest Kerr, BC
Categories: Case Studies, News

Forrest Kerr, BC – Hydroelectric Project for Alta Gas Alta Gas, a leading North American energy infrastructure company, contacted the AXISTECH Team in early 2015 regarding several BC Hydro facilities that required fibre optic termination testing and installation. The three facilities, Forrest Kerr, Volcano Creek, and McLymont Creek, are all located 1,000 km northwest of […]
Partners with the Avigilon Corporation
Categories: Case Studies, News

The Axis Systems Group Welcomes the Recognized Industry Benchmark in HD Cameras ASG – Axis Systems Group is proud to introduce one of the Highest Megapixel and Highest Resolution Video Surveillance Camera Solutions in North America… The Avigilon HD Pro. The Avigilon Corporation is an award-winning and publicly traded BC success story with design, production […]
Axis Systems Group Designs and Builds a National CCTV System
Categories: Case Studies, News

ASG – Axis Systems Group is proud to showcase the first S2IP Access Control System in Western Canada.
River Rock Casino Resort – Securing Connections
Categories: Case Studies, News

The River Rock Casino Resort (part of the Great Canadian Gaming Corporation) located on the banks of the Fraser River in Richmond, BC, was experiencing poor wireless connection coverage across the casino floor and the hotel.
AxisTech Installs IT Infrastructure Multinational’s Bootcamp
Categories: Case Studies, News

AXIS Technical Services design and built a 20,000 square foot training outpost with numerous technical and structural challenges. The open-room team concept needed to be built in a condensed timeframe to accommodate the client’s expansion into Vancouver. The AXISTECH four-man team logged 10+ hour days at six days per weeks to achieve this critical deadline and deliver the project within the budget submitted.
SFU Simon Fraser University – Discovery 1 Building Retrofit
Categories: Case Studies

Featuring photos of 4 different communication rooms, showcasing consistency and identical quality throughout the installation. Simon Fraser University – Discovery 1 Building Retrofit.
Southpointe Academy – An Integrated Digital Solution for BC’s #1 School
Categories: Case Studies

The prestigious private school (ranked 1/860 schools in BC by the Fraser Institute – 2011) is located in Tsawwassen, BC, and currently enrolls approximately 300 students…