Tag Archives: david mayhew

Making Connections… Deltaport, Mott Electric & AxisTech

Mott Electric and AxisTech once again collaborate to connect a special fibre tailing cable for two state-of-the-art “Electric Megamax STS” Cranes at Deltaport Terminal, Port of Vancouver.   According to the Deltaport Terminal website: Deltaport is the Port of Vancouver’s largest container terminal, located at Roberts Bank in Delta. It handles containerized cargo and some [...]

Senior Project Manager, David Mayhew Upgrades with FOA

The AxisTech Senior Project Manager, David Mayhew recently attended two training courses (CFI and Installer2) at The Fibre Optics Association, Inc. to upgrade and heighten the team’s collective intelligence in Fiber Optic Installations and Large-scale Communications Infrastructure. The courses were held in Portland, USA, and Toronto, Canada, during the past calendar year. Call 604 559 AXIS [...]

HYDROELECTRIC PLANT FIRE – EMERGENCY RESPONSE REPAIRS

AxisTech Emergency Response Team Rose to the Challenge and Flew to the Hydroelectric Plant near Sechelt, BC for Critical Fibre-Optic Repairs Damaged by Fire. During the September 2015 Labour Day long weekend, AxisTech Services fibre specialist team was contacted by the Hydroelectric plant owner to urgently repair a section of fibre-optic cable at the company’s [...]

Large-Scale Communications Infrastructure: HWY91 ~ HWY91a Alex Fraser Bridge & Beyond

The BC Ministry of Transport awarded contractor Trans-Western Electrical Ltd to extend the communications infrastructure of HWY91-HWY91a. TWE aligned with long-time partner, AxisTech, for the installation, termination and testing of the designed fibre optic cable system. To execute the complex project, the results-driven teams provided the large-scale communications infrastructure project with planning, expertise, knowledge, safety, [...]

Trans-Western Electrical aligns with long-time partner AxisTech for HWY91-HWY91a

The BC Ministry of Transport awarded contractor Trans-Western Electrical Ltd to extend the communications infrastructure of HWY91-HWY91a. TWE aligned with long-time partner, AxisTech, for the installation, termination and testing of the designed fibre optic cable system. To execute the complex project, the results-driven teams provided the large-scale communications infrastructure project with planning, expertise, knowledge, safety, [...]